VIT
VARIABLE INJECTION TIMING IS A METHOD IN WHICH THE TIMING OF FUEL INJECTION IS ALTERED FOR BETTER THERMAL AND POWER EFFICIENCY AND LOWER THE SPECIFIC FUEL CONSUMPTION. NOW THE QUESTION […] Continue Reading →
-
Gear Pump Overhaul
Switch off the breaker and take out the fuse. Place MEN AT WORK board. Isolate the pump by closing suction and discharge valve. Open the vent valve to check that […] Continue Reading →
-
FOAM FIRE FIGHTING SYSTEM
Monthly inspection Verify that all controls and section valves are in the proper open or closed position, and all pressure gauges are in the proper range. Quarterly inspection Verify that […] Continue Reading →
-
CO2 FIXED FIRE FIGHTING SYSTEM MAINTAINANCE
Monthly inspections At least every 30 days a general visual inspection should be made of the overall system condition for obvious signs of damage, and should include verification that: 1. […] Continue Reading →
-
CENTRIFUGAL PUMP OVERHAULING
SWITCH OF THE BREAKER AND TAKE OUT THE FUSE AND KEEP IT IN A SAFE PLACE. PLACE MEN AT WORK BOARD. CLOSE THE SUCTION AND DISCHARGE VALVE OF THE PUMP […] Continue Reading →