mariners-academy.com

HOME
MEO CLASS 1
meo class 2 & 4
  • Watch “OPERATION & MAINTENANCE OF INERT GAS SYSTEM” 

    CHENG

    Jul 18, 2017

    https://youtu.be/9EUcdxwEprk

    Know More

  • WHY RUDDER ANGLE IS LIMITED TO 35 DEGREE

    CHENG

    Jul 15, 2017

    WE KNOW THAT RUDDER IS MADE TO TURN FROM 35 TO 35. BUT THE QUESTION NOW ARISES IS THAT WHY THE ANGLE IS LIMITED TO ONLY 35 DEGREE AND NOT […]

    Know More

  • WHY ICCP IS SHUT OFF IN FRESH WATER

    CHENG

    Jul 15, 2017

    ICCP EFFICIENCY DEPEND ON THE SALINITY OF THE WATER. THIS IS BECAUSE IN SALINE WATER THE IMPEDANCE IS LESS WHICH ALLOW EASY FLOW OF CURRENT TO THE ANODES AND HELPS […]

    Know More

  • ANTI HEELING SYSTEM

    CHENG

    Jul 11, 2017

    Know More

  • FIN STABILIZER

    CHENG

    Jul 11, 2017

    https://www.youtube.com/watch?v=dT9X2TKd7fM

    Know More

  • METHOD OF GAS FREEING OF CARGO TANK

    CHENG

    Jul 9, 2017

    DILUTION METHOD OF GAS FREEING :- Dilution takes place when the incoming inert gas mixes with the original tank atmosphere to form a homogeneous mixture through the tank so that, […]

    Know More

  • WATER MIST, WATER SPRAY AND SPRINKLER SYSTEM MAINTAINANCE

    CHENG

    Jun 30, 2017

    WEEKLY MAINTENANCE :- Verify that all control panel indicators and alarms are functional. Visually inspect pump unit and its fittings. Check the pump unit valve positions, if valves are not […]

    Know More

  • FOAM FIRE FIGHTING SYSTEM

    CHENG

    Jun 30, 2017

    Monthly inspection Verify that all controls and section valves are in the proper open or closed position, and all pressure gauges are in the proper range. Quarterly inspection Verify that […]

    Know More

  • CO2 FIXED FIRE FIGHTING SYSTEM MAINTAINANCE

    CHENG

    Jun 30, 2017

    ​Monthly inspections  At least every 30 days a general visual inspection should be made of the overall system condition for obvious signs of damage, and should include verification that:  1. […]

    Know More

  • CARGO PUMP ROOM SAFETY

    CHENG

    Jun 29, 2017

    Ventilation system :- cargo pump-rooms should be mechanically ventilated and the capacity should be 20 air changes per hour of the total volume of the pump-room. the position of the […]

    Know More

1 2 3
Next Page→

School Classroom

  • Facebook
  • Twitter
  • YouTube
  • Instagram

Quick Links

  • COMMERCIAL (3)
  • ELECTRICAL (5)
  • GENERAL (38)
  • IMO CONVENTION (7)
  • MANAGEMENT (23)
  • MARINE INSURANCE (7)
  • MEO CLASS 1 (0)
  • MEO CLASS 2 & 4 (0)
  • MEP (47)
  • MOTOR (72)
  • MS ACT (2)
  • NAVAL ARCHITECTURE (8)
  • oral questions (2)
  • PERSONAL DEVELOPMENT (0)
  • PORT STATE CONTROL (1)
  • safety (26)
  • ship construction (12)
  • TECHNICAL (0)
  • Uncategorized (3)

Archive

  • July 2025 (1)
  • June 2025 (1)
  • July 2020 (25)
  • April 2020 (2)
  • November 2017 (1)
  • August 2017 (4)
  • July 2017 (117)
  • June 2017 (85)

Recent Blog

  • Improvement in Rudder efficiencyJuly 5, 2025
  • Hello world!June 20, 2025
  • CONTINOUS HATCHWAYJuly 18, 2020
  • HATCHWAYJuly 18, 2020

Powered By WordPress Theme